Skip to main content

Nitrogen+Syngas

Plant Manager+ Series 1 - 50


Technical discussions on urea plant issues and operating problems, sharing experiences, providing advice and solutions. This compilation series PDF covers Problem No. 1 to Problem No. 50.

  • Problem no. 1: Foaming in purification and concentration section
  • Problem no. 2: High biuret level at low plant loads
  • Problem no. 3: Higher vibration in high pressure pipelines
  • Problem no. 4: Gaseous ammonia and dust emissions in urea plants
  • Problem no. 5: H₂SO₄ injection in urea melt
  • Problem no. 6: Choking of urea fluid bed granulator nozzles
  • Problem no. 7: Urea melt pump damage
  • Problem no. 8: Urea prilling buckets
  • Problem no. 9: Unblocking pipelines after a urea plant shutdown
  • Problem no. 10: High CO₂ content in liquid outlet of a high pressure CO₂ stripper in urea synthesis
  • Problem no. 11: H ow to run high pressure centrifugal pumps in parallel mode
  • Problem no. 12: Oil fouling of the high pressure stripper in a urea plant
  • Problem no. 13: 3-Way valves in urea melt lines
  • Problem no. 14: High synthesis operating pressure
  • Problem no. 15: Pressure safety valve experiences
  • Problem no. 16: High pressure scrubber problem
  • Problem no. 17: Loose liner or overlay welding?
  • Problem no. 18: HP stripper passivation air
  • Problem no. 19: High pressure pumps – which is better reciprocating or centrifugal?
  • Problem no. 20: Unblocking pipelines after a urea plant shutdown (continued)
  • Problem no. 21: Vibrations in the discharge line of the HP reciprocating carbamate pump
  • Problem no. 22: How to strengthen prilled urea product
  • Problem no. 23: CO₂ compressor capacity limitation
  • Problem no. 24: Why is the minimum urea plant load 60%?
  • Problem no. 25: High temperature in top of HP scrubber
  • Problem no. 26: How to find a leak in a liner
  • Problem no. 27: How do you clean the scraper in a prilling tower?
  • Problem no. 28: How to avoid hot prills in the prill tower bottom
  • Problem no. 29: Stripper versus decomposer: What is the difference?
  • Problem no. 30: What is the best stainless steel for urea?..
  • Problem no. 31: Insulation of high-pressure flanges in a urea plant.
  • Problem no. 32: Temperature drop at bottom outlet of HP stripper in a Saipem urea plant
  • Problem no. 33: Excessive amount of carbamate solution from recirculation section
  • Problem no. 34: Reuse of off-spec waste
  • Problem no. 35: Urea plant preservation
  • Problem no. 36: Change in colour of urea product
  • Problem no. 37: Faulty reactor pressure transmitter
  • Problem no. 38: Flares in urea plants
  • Problem no. 39: Warehouse curing for urea granules
  • Problem no. 40: Medium pressure absorber in Saipem urea plant
  • Problem no. 41: Leakage of a high pressure flange connection
  • Problem no. 42: Coated urea fertilizers
  • Problem no. 43: Increased dust content of urea granules
  • Problem no. 44: Rise in HP CO₂ stripper outlet temperature
  • Problem no. 45: Effect on reactor liner in case of reactor hold up
  • Problem no. 46: CO₂ cooler failure
  • Problem no. 47: A ctive corrosion during blocking in
  • Problem no. 48: Seal systems of high pressure reciprocating pumps
  • Problem no. 49: Reverse rotation CO₂ compressor
  • Problem no. 50: Low vacuum pressure in the second-stage evaporator